Header
Header

4WK Assembly for Micronic Enterprise!

Januar 2nd, 2011 | Posted by bdriller in 2011
  • Four Stars Engineering Systems completed the development of a high resolution, single plastic body 4WK-assembly for Micronic Enterprise.
  • Successful integration into the Evolution 3 Flying Probe Tester was done this month in the Shenzhen factory of Micronic.

You can follow any responses to this entry through the RSS 2.0 Both comments and pings are currently closed.